User Tools

Site Tools


crpl:docs:isterrainlos

This is an old revision of the document!


~~DISCUSSION~~ <- CRPL reference <- Terrain and Wall Commands

IsTerrainLOS

ArgumentsResultNotation
X, Y, targetX, targetY 0 or 1 x1 y1 x2 y2 – b1

Description

Checks if there is a line of sight from the starting coordinates to the target coordinates. Line of sight means that the target terrain is at or lower than the starting terrain and that a path from the start to the target does not cross terrain that is higher.

Examples

example goes here
crpl/docs/isterrainlos.1358881728.txt.gz · Last modified: 2025/02/14 14:56 (external edit)